Berth plans

Read a plan like a strip of harbor time

A berth plan puts berths on rows and time windows in columns. The aim is to make both the reserved slots and the open slots visible at a glance.

Sample berth timeline Planned use Tide or hold
Generic berth plan by time window
Berth 06:00 09:00 12:00 15:00 18:00
B01 Arrival Load Load Open Open
B02 Open Tide check Supply Departure Open
B03 Hold Line work Open Arrival Load
B04 Open Inspection Open Supply Open

Sample plan. Real limits and time spans should come from local rules.

Plan rules

Keep the board easy to scan

Name each row

Use a short berth name that stays readable even when the board is narrow.

Keep blocks short

A few words are enough for an arrival, a work period, or a supply stop.

Leave the reason

A hold should say why the berth is kept clear and when the note can be released.

Check the fit

Keep vessel length and draft with the block so the row still makes sense later.

B03Sample berth
18 m by 5 mSample vessel size
RisingSample water note
Check linesSample next action